Civil Projects:
Earthworks (up to the foundation layer and technical buildings) preparation plan for a 40-hectare industrial site
Credit:15,542,330,650 Rials
Executive operation of the level crossing at the traffic police
Credit: 7,700,000,000 Rials
Executive operation of the level crossing in Qaraburun
Credit: 11,720,000,000 Rials